Navigate to:

ASA150 Flanged Single Wave Joint

ASA150 Flanged Single Wave Joint

Global brand of industrial process Ball valves in a wide range of materials and types. 

_________________________________________________________________

Series 2831A - Genebre ANSI 150 Expansion Bellows EPDM

Genebre 2831A ASA150 flanged single wave EPDM rubber expansion joint. Galvanised steel flanges. Size range 11/4" to 20"

Maximum pressure   10 Bar
Working temperature range  -10C to +115C



 

Please click on the product code for discounts, datasheets and more information:

Code Name Size Pressure Bore Material Voltage Seal Torque ISO Limit
Switches
Type IP Rating Namur Zoning Stock Price Qty  
GE2831A07 11/4 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £25.75
GE2831A08 11/2 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £27.41
GE2831A09 2 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £33.90
GE2831A10 21/2 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £43.15
GE2831A11 3 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £53.35
GE2831A12 4 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £66.52
GE2831A13 5 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £88.55
GE2831A14 6 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £109.25
GE2831A16 8 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £168.03
GE2831A18 10 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £278.95
GE2831A20 12 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £362.37
GE2831A22 14 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £453.30
GE2831A24 16 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £532.06
GE2831A26 18 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £629.78
GE2831A28 20 EPDM EXPANSION JOINT FLNGD ASA150 (BOX 1) Out of Stock - Factory lead time 7-10 days’   £774.85

Stock: Stock available next day = Available for next day delivery Stock available next day = Available on 2-3 day delivery Stock available next day = Factory lead time typically 7-10 days from your order.

 

 

General Note:

Please place your order by selecting the valve size you require above. Quantities shown are per box and quantity discounts relate to the number of boxes ordered. (Please note if the item name (description) above does not show a box qty - the box qty is 1. All items are sold as individual items unless specified as a box qty.

 



 

      Note that we are making some changes to our website, our website will remain live whilst the changes are implemented.