Bronze PN16 Flanged Ball Valves
Hand picked by the All Valves experts, a selection of some of the best value for money valves from various brands.
Series 10097 - Brandoni Bronze Flanged Ball Valves
Series B2.3/B2.7 valves are split-body-type, shut-off ball valves in bronze or aluminium/bronze and floating ball, manufactured in accordance with the severe product standards and quality management of ISO 9001.
Variations
- B2: EN 558-1 full bore
- R2: ANSI B16.10#150
short pattern reduced bore
- S2: ANSI B16.10#150
short pattern full bore
(Please ensure the choice of the corresponding item)
Suitability
Suitable for naval and seawater applications, heating and conditioning (HVAC), district heating, distribution and treatment of water, industrial applications, agricultural applications, for compressed air processing, oils and hydrocarbons.
YES: for installation in-line and end of line, for services with frequent acting, the integrated ISO 5211 support allows the installation of a wide range of actuators. The B2 range of ball valves of full and straight bores, reduce turbulences and minimize head loss.
NO: for steam, for choking and regulation of the flow.
Please click on the product code for discounts, datasheets and more information:
Stock: = Available for next day delivery
= Available on 2-3 day delivery
= Factory lead time typically 7-10 days from your order.
General Note:
Please place your order by selecting the product listed above, this will show any discounts available whilst also showing you additional information including technical specifications and datasheets. From this screen you can add to basket also. Note that some products will be box quantities, this should be clearly shown on screen. If there is no box quantities stated, then all items are individually listed and priced. If the item you are interested is not showing as 'In Stock', please do contact us to check the best availability or allow us to offer an alternative/ like for like product. Products showing as '2-3 Days' might actually be available next day, please check with us before leaving the site. Goods showing as factory lead time or '7-10 Days' are typically from our European stocks and can often be made available on a shorter lead time for urgent requirements.